This email address is being protected from spambots. You need JavaScript enabled to view it. + 39 331 98 26 888

02 Nov
Cartiera Pieretti E-NIP
Posted by Super User

E-NIP on PM 1 in Cartiera Pieretti (LU)

After Plant Stop for Maintenance  TeXss Alignment was called to check 1st , 2nd and calander of PM1.

The control give new and  better set up of papermaking , and take evidence for future in crown corrections. 

The situation was good , but give small details to reach the top.